PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Butler, OH permit P2026-0041: *Fence (Over 6 Ft)

Butler, OH County

Fence permit

This finaled; description: temporary installa fence permit covers Butler, OH permit P2026-0041: *Fence (Over 6 Ft) in Butler, OH County, filed February 24, 2026, with an estimated value of $1,000.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 8 records on College Corner Pike from Aug 12, 2025 through Aug 12, 2026, including 8 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Butler, OH County permits down 17% vs prior 30 days24 permits vs 29 · through May 22, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Fence work with Landscaping, Gates/access, Outdoor lighting as common follow-on categories.

  • Landscaping
  • Gates/access
  • Outdoor lighting

RECORD ACTIVITY

Activity timeline

  1. APR 28, 2026

    Butler, OH permit P2026-0167: *Commercial Building

    permit · Demolition · ISSUED; Description: Demo 40 sales floor refigerated cases an all associated overhead piping, install 42 new refrigerate · $369,447
  2. MAR 12, 2026

    Butler, OH permit P2026-0054: *Fire Suppression

    permit · Remodel/addition · FINALED; Description: Rework existing fire sprinkler system to provide proper coverage for the new renovation · $25,000
  3. MAR 10, 2026

    Butler, OH permit P2026-0043: *Fire Alarm

    permit · Remodel/addition · ISSUED; Description: Moving fire alarm devices for remodel in break room, rear restrooms and pharmacy inside of Walmart · $44,040
  4. FEBRUARY 24, 2026

    Butler, OH permit P2026-0041: *Fence (Over 6 Ft) This permit

    Permit · Fence · FINALED; Description: Temporary installation of post driven · $1,000
  5. FEB 2, 2026

    Butler, OH permit P2026-0025: *Electrical

    permit · EV charger · FINALED; Description: Temporary office trailer hookup 40amp service pulled from light pole · $2,500