Deschutes, OR permit PREL202601650: EL
This permit(s) issued; description: electrica electrical permit covers Deschutes, OR permit PREL202601650: EL in Deschutes, OR County, filed April 6, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 12 records on SE Buxton Loop from Aug 12, 2025 through Aug 12, 2026, including 12 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUL 22, 2026
Deschutes, OR permit PRPL202600845: PL
permit · Plumbing · Permit(s) Issued; Description: Plumbing · $1,800 -
JUL 10, 2026
Deschutes, OR permit PRNC202503565: NC
permit · New construction · Permit(s) Issued; Description: New Construction/Installation · $277,298 -
APRIL 6, 2026
Deschutes, OR permit PREL202601650: EL This permit
Permit · Electrical · Permit(s) Issued; Description: Electrical