PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

District of Columbia, DC permit SOL2601771:…

District of Columbia, DC County

Solar permit

This permit issued; description: installation solar permit covers District of Columbia, DC permit SOL2601771:… in District of Columbia, DC County, filed May 18, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 10 records on Perry Street NE from Aug 12, 2025 through Aug 12, 2026, including 10 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

District of Columbia, DC County permits down 1% vs prior 30 days1612 permits vs 1621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.

  • Roofers (pre-install inspect)
  • Battery/backup
  • EV charger
  • Electricians

RECORD ACTIVITY

Activity timeline

  1. MAY 18, 2026

    District of Columbia, DC permit SOL2601771:… This permit

    Permit · Solar · PERMIT ISSUED; Description: Installation of 22 KW Dc rooftop