District of Columbia, DC permit SOL2501176:…
This permit issued; description: the project solar permit covers District of Columbia, DC permit SOL2501176:… in District of Columbia, DC County, filed March 6, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 38 records on Tobias Drive SE from Aug 12, 2025 through Aug 12, 2026, including 38 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.
- Roofers (pre-install inspect)
- Battery/backup
- EV charger
- Electricians
RECORD ACTIVITY
Activity timeline
-
JUN 11, 2026
District of Columbia, DC permit SOL2602334: CONSTRUCTION
permit · Solar · PERMIT ISSUED; Description: This is a Revision for Permit: SOL2501176 to match Stamped Plans from 17 Panels to 20 Panels -
MARCH 6, 2026
District of Columbia, DC permit SOL2501176:… This permit
Permit · Solar · PERMIT ISSUED; Description: THE PROJECT SCOPE INCLUDES THE I -
MAR 6, 2026
District of Columbia, DC permit E2606269: SUPPLEMENTAL
permit · Electrical · PERMIT ISSUED; Description: Electrical Trade Permit