PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

District of Columbia, DC permit E2605758:…

District of Columbia, DC County

Electrical permit

This permit issued; description: electrical t electrical permit covers District of Columbia, DC permit E2605758:… in District of Columbia, DC County, filed February 20, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 21 records on Frederick Douglass Court SE from Aug 12, 2025 through Aug 12, 2026, including 21 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

District of Columbia, DC County permits down 1% vs prior 30 days1612 permits vs 1621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUN 10, 2026

    District of Columbia, DC permit SOL2602322: CONSTRUCTION

    permit · Solar · PERMIT ISSUED; Description: This is a Revision for Permit: SOL2501218 to match Stamped Plans from 23 Panels to 22 Panels
  2. FEBRUARY 20, 2026

    District of Columbia, DC permit E2605758:… This permit

    Permit · Electrical · PERMIT ISSUED; Description: Electrical Trade Permit
  3. FEB 20, 2026

    District of Columbia, DC permit SOL2501218: CONSTRUCTION

    permit · Solar · PERMIT ISSUED; Description: THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A 10