Virginia Beach city, VA permit 2026-ELER-07798:…
This active; description: 200 amp new service electrical permit covers Virginia Beach city, VA permit 2026-ELER-07798:… in Virginia Beach city, VA County, filed March 25, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 18 records on 13Th Street from Aug 12, 2025 through Aug 12, 2026, including 18 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
APR 20, 2026
Virginia Beach city, VA permit 2026-MECR-10170: Mechanical
permit · HVAC · Active; Description: Install 2 -
APR 20, 2026
Virginia Beach city, VA permit 2026-MECR-10169: Mechanical
permit · HVAC · Active; Description: Install 2 -
MARCH 25, 2026
Virginia Beach city, VA permit 2026-ELER-07798:… This permit
Permit · Electrical · Active; Description: 200 AMP NEW SERVICE / DOMINION POWER #1 -
MAR 25, 2026
Virginia Beach city, VA permit 2026-ELER-07799: Electrical
permit · Electrical · Active; Description: 200 AMP NEW SERVICE / DOMINION POWER #10846520 -
MAR 24, 2026
Virginia Beach city, VA permit 2026-PLBR-06895: Plumbing
permit · Plumbing · Active -
MAR 24, 2026
Virginia Beach city, VA permit 2026-PLBR-06894: Plumbing
permit · Plumbing · Active -
MAR 6, 2026
Virginia Beach city, VA permit 2026-BDRN-03775: Building
permit · Unclassified · Active; Description: DUPLEX A – R52021 VRC5B CONSRUCTIONFIRE SEPARETION 0-3ft -
MAR 6, 2026
Virginia Beach city, VA permit 2026-BDRN-03776: Building
permit · Unclassified · Active; Description: DUPLEX RESIDENCE SIDE A/B – R5 2021 VRC5B CONSTRUCTIONFIRE SEPARATION < 0FT***SOUND TEST REQUIRED P