Travis, TX permit 2026-077836 EP: Electrical Permit
This final; description: tpole ref bp # 2026- electrical permit covers Travis, TX permit 2026-077836 EP: Electrical Permit in Austin, filed June 24, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 53 records on Elijah Craig Way from Aug 13, 2025 through Aug 13, 2026, including 53 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUNE 24, 2026
Travis, TX permit 2026-077836 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: TPOLE REF BP # 2026-036951 -
JUN 23, 2026
Travis, TX permit 2026-036951 MP: Mechanical Permit
permit · HVAC · Active; Description: New construction of single family dwelling with 4 bedrooms and 3 -
JUN 3, 2026
Travis, TX permit 2026-036951 EP: Electrical Permit
permit · New construction · Active; Description: New construction of single family dwelling with 4 bedrooms and 3 -
MAY 14, 2026
Travis, TX permit 2026-036951 PP: Plumbing Permit
permit · New construction · Active; Description: New construction of single family dwelling with 4 bedrooms and 3 -
APR 1, 2026
Travis, TX permit 2026-036951 BP: Building Permit
permit · New construction · Active; Description: New construction of single family dwelling with 4 bedrooms and 3