Travis, TX permit 2026-078100 EP: Electrical Permit
This final; description: stand alone tpole pe electrical permit covers Travis, TX permit 2026-078100 EP: Electrical Permit in Austin, filed June 22, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 6 records on Rockledge Cove from Aug 12, 2025 through Aug 12, 2026, including 6 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUN 22, 2026
Travis, TX permit 2026-071791 EP: Electrical Permit
permit · Remodel/addition · Active; Description: Addition and remodel -
JUNE 22, 2026
Travis, TX permit 2026-078100 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: stand alone tpole permit related to 2026 -
JUN 16, 2026
Travis, TX permit 2026-071791 MP: Mechanical Permit
permit · HVAC · Active; Description: Addition and remodel -
JUN 9, 2026
Travis, TX permit 2026-071791 BP: Building Permit
permit · Remodel/addition · Active; Description: Addition and remodel · $1