PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Travis, TX permit 2026-070930 PP: Plumbing Permit

Austin · Travis, TX County

Remodel/addition permit

This active; description: 7 day - interior re remodel/addition permit covers Travis, TX permit 2026-070930 PP: Plumbing Permit in Austin, filed June 8, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 101 records on W Parmer Lane from Aug 12, 2025 through Aug 12, 2026, including 101 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Travis, TX County permits up 12% vs prior 30 days4988 permits vs 4473 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Remodel/addition work with Countertop, Cabinet, Flooring, Appliance, Painting, Security, Cleaning as common follow-on categories.

  • Countertop
  • Cabinet
  • Flooring
  • Appliance
  • Painting
  • Security
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. JUL 27, 2026

    Travis, TX permit 2026-090011 EP: Electrical Permit

    permit · Remodel/addition · Active; Description: INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
  2. JUL 24, 2026

    Travis, TX permit 2026-090011 PP: Plumbing Permit

    permit · Remodel/addition · Active; Description: INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
  3. JUL 23, 2026

    Travis, TX permit 2026-090011 BP: Building Permit

    permit · Remodel/addition · Active; Description: INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
  4. JUNE 8, 2026

    Travis, TX permit 2026-070930 PP: Plumbing Permit This permit

    Permit · Remodel/addition · Active; Description: 7 DAY - INTERIOR REMODEL PHASE 1 CREATI
  5. JUN 5, 2026

    Travis, TX permit 2026-070930 BP: Building Permit

    permit · Remodel/addition · Active; Description: 7 DAY - INTERIOR REMODEL PHASE 1 CREATING UNIT 350 DEMISING WALL BREAKROOM SAF OFFICE SPACE - OVA