Travis, TX permit 2025-075885 EP: Electrical Permit
This final; description: new manufactured hom electrical permit covers Travis, TX permit 2025-075885 EP: Electrical Permit in Austin, filed May 29, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 5 records on Palomino Trail from Aug 12, 2025 through Aug 12, 2026, including 5 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUN 2, 2026
Travis, TX permit 2025-075885 DS: Driveway / Sidewalks
permit · Unclassified · Final; Description: Construct new driveway approach of 16 FT -
MAY 29, 2026
Travis, TX permit 2025-075885 PP: Plumbing Permit
permit · Plumbing · Active; Description: New Manufactured home to be placed on vacant lot with permanent foundation standard utilities -
MAY 29, 2026
Travis, TX permit 2025-075885 BP: Building Permit
permit · Unclassified · Active; Description: New Manufactured home to be placed on vacant lot with permanent foundation standard utilities -
MAY 29, 2026
Travis, TX permit 2025-075885 MP: Mechanical Permit
permit · HVAC · Active; Description: New Manufactured home to be placed on vacant lot with permanent foundation standard utilities -
MAY 29, 2026
Travis, TX permit 2025-075885 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: New Manufactured home to be placed on va