PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Travis, TX permit 2026-055683 BP: Building Permit

Austin · Travis, TX County

Roofing permit

This active; description: the proposed work c roofing permit covers Travis, TX permit 2026-055683 BP: Building Permit in Austin, filed May 13, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 26 records on E 11Th Street from Aug 12, 2025 through Aug 12, 2026, including 26 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Travis, TX County permits up 12% vs prior 30 days4988 permits vs 4473 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Roofing work with Gutters, Solar, Attic insulation, Skylights as common follow-on categories.

  • Gutters
  • Solar
  • Attic insulation
  • Skylights

RECORD ACTIVITY

Activity timeline

  1. JUN 29, 2026

    Travis, TX permit 2025-100925 EP: Electrical Permit

    permit · Roofing · Final; Description: Removal of Existing Roofing System on the Entire School with a new PVC Roofing System
  2. MAY 15, 2026

    Travis, TX permit 2026-055683 MP: Mechanical Permit

    permit · Roofing · Final; Description: The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof
  3. MAY 13, 2026

    Travis, TX permit 2026-055683 EP: Electrical Permit

    permit · Roofing · Final; Description: The proposed work consists of the replacement of AHU-1 and AHU-3 with associated penthouse and roof
  4. MAY 13, 2026

    Travis, TX permit 2026-055683 BP: Building Permit This permit

    Permit · Roofing · Active; Description: The proposed work consists of the repla