PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Travis, TX permit 2026-055350 MP: Mechanical Permit

Austin · Travis, TX County

Mechanical Permit

This withdrawn permit covers Travis, TX permit 2026-055350 MP: Mechanical Permit in Austin, filed May 6, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 9 records on Lazy Lane from Aug 12, 2025 through Aug 12, 2026, including 9 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Travis, TX County permits up 12% vs prior 30 days4988 permits vs 4473 · through Aug 10, 2026

RECORD ACTIVITY

Activity timeline

  1. AUG 7, 2026

    Travis, TX permit 2026-101910 EP: Electrical Permit

    permit · Electrical · Final; Description: Requesting stand alone permit for installation of receptacle for pump at the lift station which is u
  2. JUL 30, 2026

    Travis, TX permit 2026-098501 PP: Plumbing Permit

    permit · Remodel/addition · Final; Description: repairing a deteriorating sewer line and an interior drain leak
  3. MAY 7, 2026

    Travis, TX permit 2026-004591 MP: Mechanical Permit

    permit · HVAC · Final; Description: Express: sheetrock repair window replacement siding repair exempt work (flooring tiling door replace
  4. MAY 6, 2026

    Travis, TX permit 2026-055350 MP: Mechanical Permit This permit

    Permit · Withdrawn
  5. FEB 15, 2026

    Travis, TX permit 2026-004591 EP: Electrical Permit

    permit · Electrical · Final; Description: Express: sheetrock repair window replacement siding repair exempt work (flooring tiling door replace
  6. FEB 2, 2026

    Travis, TX permit 2026-004591 PP: Plumbing Permit

    permit · Plumbing · Final; Description: Express: sheetrock repair window replacement siding repair exempt work (flooring tiling door replace