Travis, TX permit 2026-048820 EP: Electrical Permit
This final; description: tpole - 2026 037344 electrical permit covers Travis, TX permit 2026-048820 EP: Electrical Permit in Austin, filed April 21, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 7 records on Cavalcade Court from Aug 12, 2025 through Aug 12, 2026, including 7 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
MAY 6, 2026
Travis, TX permit 2026-037344 EP: Electrical Permit
permit · New construction · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res -
APRIL 21, 2026
Travis, TX permit 2026-048820 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: Tpole - 2026 037344 000 00 BP -
APR 20, 2026
Travis, TX permit 2026-037344 MP: Mechanical Permit
permit · HVAC · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res -
APR 20, 2026
Travis, TX permit 2026-037345 PP: Plumbing Permit
permit · Pool · Active; Description: New pool and spa (autofill/heated) -
APR 20, 2026
Travis, TX permit 2026-037344 PP: Plumbing Permit
permit · New construction · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res -
MAR 27, 2026
Travis, TX permit 2026-037345 BP: Building Permit
permit · Pool · Active; Description: New pool and spa (autofill/heated) -
MAR 27, 2026
Travis, TX permit 2026-037344 BP: Building Permit
permit · New construction · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res