PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Travis, TX permit 2025-110308 EP: Electrical Permit

Austin · Travis, TX County

New construction permit

This active; description: home: unit 1b new t new construction permit covers Travis, TX permit 2025-110308 EP: Electrical Permit in Austin, filed March 18, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 7 records on Clover Court from Aug 12, 2025 through Aug 12, 2026, including 7 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Travis, TX County permits up 22% vs prior 30 days5224 permits vs 4281 · through Aug 11, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. MAR 19, 2026

    Travis, TX permit 2025-110308 PP: Plumbing Permit

    permit · New construction · Active; Description: Home: Unit 1B New two story Duplex with attached carport 3/3
  2. MARCH 18, 2026

    Travis, TX permit 2025-110308 EP: Electrical Permit This permit

    Permit · New construction · Active; Description: Home: Unit 1B New two story Duplex with