PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Travis, TX permit 2025-097564 PP: Plumbing Permit

Austin · Travis, TX County

Remodel/addition permit

This final; description: interior remodel of remodel/addition permit covers Travis, TX permit 2025-097564 PP: Plumbing Permit in Austin, filed March 16, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 103 records on Congress Avenue from Aug 12, 2025 through Aug 12, 2026, including 103 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Travis, TX County permits up 12% vs prior 30 days4988 permits vs 4473 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Remodel/addition work with Countertop, Cabinet, Flooring, Appliance, Painting, Security, Cleaning as common follow-on categories.

  • Countertop
  • Cabinet
  • Flooring
  • Appliance
  • Painting
  • Security
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. MAR 17, 2026

    Travis, TX permit 2025-097564 EP: Electrical Permit

    permit · Remodel/addition · Final; Description: Interior remodel of existing office space dividing full floor into new spec suite 220
  2. MARCH 16, 2026

    Travis, TX permit 2025-097564 PP: Plumbing Permit This permit

    Permit · Remodel/addition · Final; Description: Interior remodel of existing office spac
  3. MAR 16, 2026

    Travis, TX permit 2025-097564 MP: Mechanical Permit

    permit · HVAC · Final; Description: Interior remodel of existing office space dividing full floor into new spec suite 220
  4. MAR 4, 2026

    Travis, TX permit 2025-097564 BP: Building Permit

    permit · Remodel/addition · Active; Description: Interior remodel of existing office space dividing full floor into new spec suite 220