Travis, TX permit 2025-084794 EP: Electrical Permit
This final; description: new construction of new construction permit covers Travis, TX permit 2025-084794 EP: Electrical Permit in Austin, filed March 6, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 125 records on Curb Strap Drive from Aug 12, 2025 through Aug 12, 2026, including 125 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
APR 14, 2026
Travis, TX permit 2025-084794 MP: Mechanical Permit
permit · HVAC · Final; Description: New construction of 1 story SFR with attached garage covered porch and patio PUD -
APR 8, 2026
Travis, TX permit 2026-042242 PP: Plumbing Permit
permit · Plumbing · Final; Description: New Irrigation Installation -
MAR 9, 2026
Travis, TX permit 2025-084794 PP: Plumbing Permit
permit · New construction · Final; Description: New construction of 1 story SFR with attached garage covered porch and patio PUD -
MAR 9, 2026
Travis, TX permit 2026-027196 EP: Electrical Permit
permit · New construction · Final; Description: TEMPORARY TPOLE FOR NEW CONSTRUCTION IN WILDHORSE Ref: 2025-084794 BP -
MARCH 6, 2026
Travis, TX permit 2025-084794 EP: Electrical Permit This permit
Permit · New construction · Final; Description: New construction of 1 story SFR with att