Travis, TX permit 2025-091016 EP: Electrical Permit
This active; description: upgrade from 200amp electrical permit covers Travis, TX permit 2025-091016 EP: Electrical Permit in Austin, filed March 2, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
This is the only record collected on Sweet Autumn Cove in the latest 12-month window.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
MARCH 2, 2026
Travis, TX permit 2025-091016 EP: Electrical Permit This permit
Permit · Electrical · Active; Description: Upgrade from 200amp to 350amp service