Travis, TX permit 2026-023917 EP: Electrical Permit
This final; description: temporary power loop electrical permit covers Travis, TX permit 2026-023917 EP: Electrical Permit in Austin, filed February 27, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 59 records on Dongan Drive from Aug 12, 2025 through Aug 12, 2026, including 59 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUN 5, 2026
Travis, TX permit 2026-067914 PP: Plumbing Permit
permit · Plumbing · Final; Description: Irrigation Installation -
APR 2, 2026
Travis, TX permit 2025-134773 MP: Mechanical Permit
permit · HVAC · Final; Description: 2 story SFR with 4 bedrooms 3 baths covered porch and attached garage -
FEBRUARY 27, 2026
Travis, TX permit 2026-023917 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: Temporary power loop for construction -
FEB 27, 2026
Travis, TX permit 2025-134773 EP: Electrical Permit
permit · Electrical · Final; Description: 2 story SFR with 4 bedrooms 3 baths covered porch and attached garage