Travis, TX permit 2026-013915 EP: Electrical Permit
This final; description: temp power for 2821 electrical permit covers Travis, TX permit 2026-013915 EP: Electrical Permit in Austin, filed February 16, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 5 records on Salado Street from Aug 12, 2025 through Aug 12, 2026, including 5 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
APR 10, 2026
Travis, TX permit 2025-163520 MP: Mechanical Permit
permit · HVAC · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res -
FEBRUARY 16, 2026
Travis, TX permit 2026-013915 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: Temp power for 2821 Salado Ref: 2025-163 -
FEB 16, 2026
Travis, TX permit 2025-163520 EP: Electrical Permit
permit · New construction · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res -
FEB 3, 2026
Travis, TX permit 2025-163520 PP: Plumbing Permit
permit · New construction · Active; Description: ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res -
JAN 29, 2026
Travis, TX permit 2025-161068 PP: Plumbing Permit
permit · Demolition · Final; Description: CapOff W/WW Total demo of SFR 2168 SqFt circa 1923