Travis, TX permit 2025-159763 EP: Electrical Permit
This final; description: new construction of new construction permit covers Travis, TX permit 2025-159763 EP: Electrical Permit in Austin, filed February 5, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 48 records on Sweet Bark Street from Aug 13, 2025 through Aug 13, 2026, including 48 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
MAR 3, 2026
Travis, TX permit 2025-159763 MP: Mechanical Permit
permit · HVAC · Final; Description: New construction of a 2-story single family dwelling in a condo regime -
FEB 9, 2026
Travis, TX permit 2026-014215 EP: Electrical Permit
permit · Electrical · Final; Description: Homebuilders loop for New SFR ref 2025-159763 BP -
FEBRUARY 5, 2026
Travis, TX permit 2025-159763 EP: Electrical Permit This permit
Permit · New construction · Final; Description: New construction of a 2-story single fam