Travis, TX permit 2026-012893 BP: Building Permit
This final; description: new construction of new construction permit covers Travis, TX permit 2026-012893 BP: Building Permit in Austin, filed February 4, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 46 records on Wind Chime Drive from Aug 12, 2025 through Aug 12, 2026, including 46 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
JUN 10, 2026
Travis, TX permit 2026-012893 EP: Electrical Permit
permit · New construction · Final; Description: New construction of 2 story SFR with 4 beds 3 -
MAR 23, 2026
Travis, TX permit 2026-033908 PP: Plumbing Permit
permit · Plumbing · Final; Description: irrigation for lawn -
FEB 27, 2026
Travis, TX permit 2026-023467 EP: Electrical Permit
permit · Solar · Final; Description: Install new 7 -
FEB 11, 2026
Travis, TX permit 2026-014241 EP: Electrical Permit
permit · Electrical · Final; Description: Home builders loop Ref: 2026-012893 EP -
FEB 9, 2026
Travis, TX permit 2026-012893 MP: Mechanical Permit
permit · HVAC · Final; Description: New construction of 2 story SFR with 4 beds 3 -
FEB 5, 2026
Travis, TX permit 2026-012893 PP: Plumbing Permit
permit · New construction · Final; Description: New construction of 2 story SFR with 4 beds 3 -
FEBRUARY 4, 2026
Travis, TX permit 2026-012893 BP: Building Permit This permit
Permit · New construction · Final; Description: New construction of 2 story SFR with 4 b