Travis, TX permit 2026-012751 EP: Electrical Permit
This final; description: new construction of new construction permit covers Travis, TX permit 2026-012751 EP: Electrical Permit in Austin, filed February 4, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 119 records on Golden Lion Drive from Aug 12, 2025 through Aug 12, 2026, including 119 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.
- HVAC
- Gutters
- Driveway/concrete
- Landscaping
- Security/low-voltage
- Solar
- Fence
- Window treatment
- Cleaning
RECORD ACTIVITY
Activity timeline
-
APR 3, 2026
Travis, TX permit 2026-039876 PP: Plumbing Permit
permit · Plumbing · Final; Description: Install Sprinkler System -
FEB 5, 2026
Travis, TX permit 2026-013688 EP: Electrical Permit
permit · Electrical · Final; Description: Home builders loop Ref: 2026-012751 EP -
FEB 4, 2026
Travis, TX permit 2026-012751 BP: Building Permit
permit · New construction · Final; Description: New construction of 2 story SFR 4 bed 3 bath with attached garage and front covered porch/rear cover -
FEBRUARY 4, 2026
Travis, TX permit 2026-012751 EP: Electrical Permit This permit
Permit · New construction · Final; Description: New construction of 2 story SFR 4 bed 3 -
FEB 4, 2026
Travis, TX permit 2026-012751 MP: Mechanical Permit
permit · HVAC · Final; Description: New construction of 2 story SFR 4 bed 3 bath with attached garage and front covered porch/rear cover -
FEB 4, 2026
Travis, TX permit 2026-012751 PP: Plumbing Permit
permit · New construction · Final; Description: New construction of 2 story SFR 4 bed 3 bath with attached garage and front covered porch/rear cover