Travis, TX permit 2026-009744 EP: Electrical Permit
This final; description: etj new service for electrical permit covers Travis, TX permit 2026-009744 EP: Electrical Permit in Austin, filed January 27, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 38 records on Derwent Drive from Aug 12, 2025 through Aug 12, 2026, including 38 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
MAR 2, 2026
Travis, TX permit 2026-024467 PP: Plumbing Permit
permit · Plumbing · Final; Description: Install Irrigation System -
JANUARY 27, 2026
Travis, TX permit 2026-009744 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: ETJ new service for SFR -
JAN 27, 2026
Travis, TX permit 2026-010133 PP: Plumbing Permit
permit · New construction · Final; Description: ETJ New Construction of SFR 1468sqft Meter Installation -
JAN 27, 2026
Travis, TX permit 2026-008830 EP: Electrical Permit
permit