PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Maricopa, AZ permit PMT26-03559: COM

Maricopa, AZ County

Generator permit

This c of c issued; description: addition of generator permit covers Maricopa, AZ permit PMT26-03559: COM in Maricopa, AZ County, filed May 5, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 36 records on E Elliot Road from Aug 12, 2025 through Aug 12, 2026, including 36 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Maricopa, AZ County permits up 16% vs prior 30 days922 permits vs 796 · through Aug 11, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Generator work with Electrician, Propane/gas as common follow-on categories.

  • Electrician
  • Propane/gas

RECORD ACTIVITY

Activity timeline

  1. AUG 3, 2026

    Maricopa, AZ permit PMT26-08686: COM

    permit · Electrical · Issued; Description: New private utility substation
  2. JUL 23, 2026

    Maricopa, AZ permit PMT26-05251: COM

    permit · Unclassified · Issued; Description: New parking canopies totaling 11,140 SF at new building site
  3. JUN 18, 2026

    Maricopa, AZ permit PMT26-01256: COM

    permit · HVAC · Issued; Description: New ground up 285,282 SF unlimited area data hall building with type II-B construction
  4. MAY 5, 2026

    Maricopa, AZ permit PMT26-03559: COM This permit

    Permit · Generator · C of C Issued; Description: Addition of catwalks and stair t
  5. APR 7, 2026

    Maricopa, AZ permit PMT25-12326: COM

    permit · Unclassified · Issued; Description: Case Study to determine level of Fire Protection needed for ancillary support buildings on site
  6. APR 1, 2026

    Maricopa, AZ permit PMT25-21917: COM

    permit · Electrical · Issued; Description: Phase 1 building smart cooling · $37,606
  7. FEB 9, 2026

    Maricopa, AZ permit PMT25-22348: COM

    permit · HVAC · Issued; Description: Foundations: This scope includes the construction of a 284,497 SF Data Center Building and supporti · $36,751,322