East Baton Rouge Parish, LA permit 18067968:…
This electrical permit covers East Baton Rouge Parish, LA permit 18067968:… in De Province, filed May 19, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 31 records on Boulevard from Aug 12, 2025 through Aug 12, 2026, including 31 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
MAY 19, 2026
East Baton Rouge Parish, LA permit 18073568: Occupancy Permit (R)
permit · Unclassified -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18074490: Occupancy Permit (R)
permit · Unclassified -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18080564: Occupancy Permit (R)
permit · Unclassified -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18064840: Occupancy Permit (R)
permit · Unclassified -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18080584: Occupancy Permit (R)
permit · Unclassified -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18067968:… This permit
Permit · Electrical -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18071087: Occupancy Permit (R)
permit · Unclassified -
MAY 19, 2026
East Baton Rouge Parish, LA permit 18080544: Occupancy Permit (R)
permit · Unclassified -
MAY 15, 2026
East Baton Rouge Parish, LA permit 18066694: Occupancy Permit (R)
permit · Unclassified -
MAY 15, 2026
East Baton Rouge Parish, LA permit 18061904: Occupancy Permit (R)
permit · Unclassified -
MAY 15, 2026
East Baton Rouge Parish, LA permit 18064863: Occupancy Permit (R)
permit · Unclassified