LIVE PERMIT
Travis, TX permit 2026-090654 BP: Building Permit
This active; description: total demo of sfr 1 demolition permit covers Travis, TX permit 2026-090654 BP: Building Permit in Austin, filed July 23, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
This is the only record collected on Tower Drive in the latest 12-month window.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.
Travis, TX County permits up 134% vs prior 30 days4988 permits vs 2135 · through Aug 10, 2026
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Demolition work with New-construction GC, Hauling/dumpster as common follow-on categories.
- New-construction GC
- Hauling/dumpster
RECORD ACTIVITY
Activity timeline
-
JULY 23, 2026
Travis, TX permit 2026-090654 BP: Building Permit This permit
Permit · Demolition · Active; Description: Total demo of sfr 1860 sqft circa 1950