PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Travis, TX permit 2026-091970 EP: Electrical Permit

Austin · Travis, TX County

Electrical permit

This active; description: pb condo- new 2-sto electrical permit covers Travis, TX permit 2026-091970 EP: Electrical Permit in Austin, filed July 20, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 50 records on Robert Zion Way from Aug 11, 2025 through Aug 11, 2026, including 50 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.

Travis, TX County permits up 132% vs prior 30 days11946 permits vs 5156 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. AUG 4, 2026

    Travis, TX permit 2026-091970 PP: Plumbing Permit

    permit · Plumbing · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2
  2. AUG 4, 2026

    Travis, TX permit 2026-091970 PP: Plumbing Permit

    permit · Plumbing · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2
  3. JUL 22, 2026

    Travis, TX permit 2026-093276 EP: Electrical Permit

    permit · Electrical · Final; Description: HOME BUILDERS LOOP for New SFR COA BP: 2026-091970 Bluebonnet
  4. JUL 22, 2026

    Travis, TX permit 2026-093276 EP: Electrical Permit

    permit · Electrical · Final; Description: HOME BUILDERS LOOP for New SFR COA BP: 2026-091970 Bluebonnet
  5. JUL 20, 2026

    Travis, TX permit 2026-091970 BP: Building Permit

    permit · Unclassified · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2
  6. JUL 20, 2026

    Travis, TX permit 2026-091970 EP: Electrical Permit

    permit · Electrical · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2
  7. JUL 20, 2026

    Travis, TX permit 2026-091970 BP: Building Permit

    permit · Unclassified · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2
  8. JULY 20, 2026

    Travis, TX permit 2026-091970 EP: Electrical Permit This permit

    Permit · Electrical · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2