Travis, TX permit 2026-075736 EP: Electrical Permit
This final; description: home builders loop r electrical permit covers Travis, TX permit 2026-075736 EP: Electrical Permit in Austin, filed July 7, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 3 records on Adhara Pass from Aug 11, 2025 through Aug 11, 2026, including 3 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUL 27, 2026
Travis, TX permit 2025-046650 MP: Mechanical Permit
permit · HVAC · Active; Description: New Condo - with 5 bedrooms 6 bathrooms covered patio on 1st and 2nd floor covered porch with 3 car -
JULY 7, 2026
Travis, TX permit 2026-075736 EP: Electrical Permit This permit
Permit · Electrical · Final; Description: Home builders loop Ref: 2025-046650 EP