PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

H - Residential New Construction Permit

Gainesville · Hall County

New construction permit

This pending; description: moving a house fro new construction permit covers H - Residential New Construction Permit in Gainesville, filed August 11, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 2 records on Lawson Robinson Road from Aug 11, 2025 through Aug 11, 2026, including 2 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. AUGUST 11, 2026

    H - Residential New Construction Permit This permit

    Permit · New construction · Pending; Description: Moving a house from 4620 Setting Down
  2. JUL 30, 2026

    Hall permit HZCU26-0028: H - Zoning Conditional Use

    permit · Unclassified · Pending; Description: I am requesting to move a house that was built in 1995 that is in great condition to the lot I own