PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Wake, NC permit BLDNR-030097-2026: Building

Raleigh · Wake, NC County

EV charger permit

This complete; description: install 48a tesla ev charger permit covers Wake, NC permit BLDNR-030097-2026: Building in Raleigh, filed July 17, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

This is the only record collected on Etta Burke Court in the latest 12-month window.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Wake, NC County permits down 13% vs prior 30 days431 permits vs 497 · through Aug 11, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.

  • Electrician (panel upgrade)
  • Solar

RECORD ACTIVITY

Activity timeline

  1. JULY 17, 2026

    Wake, NC permit BLDNR-030097-2026: Building This permit

    Permit · EV charger · Complete; Description: Install 48A Tesla Charger EV Install