District of Columbia, DC permit SOL2504278:…
This permit issued; description: scope of wor solar permit covers District of Columbia, DC permit SOL2504278:… in District of Columbia, DC County, filed October 1, 2025; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 46 records on 38Th Street NW from Aug 12, 2025 through Aug 12, 2026, including 46 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.
- Roofers (pre-install inspect)
- Battery/backup
- EV charger
- Electricians
RECORD ACTIVITY
Activity timeline
-
OCTOBER 1, 2025
District of Columbia, DC permit SOL2504278:… This permit
Permit · Solar · PERMIT ISSUED; Description: SCOPE OF WORK TO INSTALL A ROOF -
SEP 9, 2025
District of Columbia, DC permit P2511051: SUPPLEMENTAL
permit · Plumbing · PERMIT ISSUED; Description: Plumbing trade Permit