PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This issued; description: change out 100-amp electrical permit covers Boulder, CO permit… in Boulder, filed August 12, 2026, with an estimated value of $4,803.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 10 records on Edinboro Drive from Aug 13, 2025 through Aug 13, 2026, including 10 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 20% vs prior 30 days730 permits vs 609 · through Aug 12, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. AUGUST 12, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Issued; Description: Change out 100-amp panel to a 200-amp p · $4,803