Boulder, CO permit…
This issued; description: adjustable ev charg ev charger permit covers Boulder, CO permit… in Boulder, filed August 12, 2026, with an estimated value of $780.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 32 records on Table Mesa Drive from Aug 13, 2025 through Aug 13, 2026, including 32 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.
- Electrician (panel upgrade)
- Solar
RECORD ACTIVITY
Activity timeline
-
AUGUST 12, 2026
Boulder, CO permit… This permit
Permit · EV charger · Issued; Description: Adjustable EV charger install: Hardwire · $780