PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

HVAC permit

This issued; description: heat pump replacing hvac permit covers Boulder, CO permit… in Boulder, filed August 11, 2026, with an estimated value of $9,445.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 10 records on Lehigh Street from Aug 13, 2025 through Aug 13, 2026, including 10 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 20% vs prior 30 days730 permits vs 609 · through Aug 12, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect HVAC work with Insulation, Duct cleaning, Smart thermostat, Air quality, Solar as common follow-on categories.

  • Insulation
  • Duct cleaning
  • Smart thermostat
  • Air quality
  • Solar

RECORD ACTIVITY

Activity timeline

  1. AUGUST 11, 2026

    Boulder, CO permit… This permit

    Permit · HVAC · Issued; Description: heat pump replacing air conditioner **P · $9,445
  2. APR 17, 2026

    Boulder, CO permit 5e1438bd-d310-4930-8ef5-d2b13af29be5: Electrical Permit

    permit · Electrical · Letter of Completion; Description: Replacing 1 old can light and adding 3 more in the soffit, same location for all ligh · $700
  3. FEB 25, 2026

    Boulder, CO permit a8d7a16d-b411-4b13-85dc-71e7f1bcc0c5: Roofing Replacement Permit

    permit · Roofing · Issued; Description: **All Structures must be permitted separately** Total tear-off & reroof of SFD, 25 squares of dimen · $15,800
  4. FEB 19, 2026

    Boulder, CO permit bf16a4da-b113-4b3d-9099-765762b291cb: Siding Replacement Permit

    permit · Unclassified · Letter of Completion; Description: Remove and replace all siding · $54,000