PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

H - Residential New Construction Permit

Gainesville · Hall County

New construction permit

This inspection phase; description: built fro new construction permit covers H - Residential New Construction Permit in Gainesville, filed August 13, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 2 records on Roy Parks Road from Aug 13, 2025 through Aug 13, 2026, including 2 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 13, 2025 through Aug 13, 2026. The count includes this filing and only records in our database.

Hall County permits up 947% vs prior 30 days670 permits vs 64 · through Aug 13, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. AUGUST 13, 2026

    H - Residential New Construction Permit This permit

    Permit · New construction · Inspection Phase; Description: BUILT FRONT GABLE
  2. AUG 5, 2026

    Hall permit HRELE26-0492: H - Residential Electrical Permit

    permit · Electrical · Inspection Phase; Description: UPDATE ELECTRICAL SERVICE