Williamson, TX permit 2026-091970 EP: Electrical…
This active; description: pb condo- new 2-sto electrical permit covers Williamson, TX permit 2026-091970 EP: Electrical… in Austin, filed July 20, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 29 records on Robert Zion Way from Aug 14, 2025 through Aug 14, 2026, including 29 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 14, 2025 through Aug 14, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
AUG 4, 2026
Williamson, TX permit 2026-091970 PP: Plumbing Permit
permit · Plumbing · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2 -
JUL 22, 2026
Williamson, TX permit 2026-093276 EP: Electrical Permit
permit · Electrical · Final; Description: HOME BUILDERS LOOP for New SFR COA BP: 2026-091970 Bluebonnet -
JUL 20, 2026
Williamson, TX permit 2026-091970 BP: Building Permit
permit · Unclassified · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2 -
JULY 20, 2026
Williamson, TX permit 2026-091970 EP: Electrical… This permit
Permit · Electrical · Active; Description: PB Condo- New 2-Story Condo SFR 3 bed 2