LIVE PERMIT
Residential Addition
This inspection phase remodel/addition permit covers Residential Addition in Newnan, filed August 18, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
This is the only record collected on Pine Knoll Drive in the latest 12-month window.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
Coweta County permits up 160% vs prior 30 days314 permits vs 121 · through Aug 19, 2026
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Remodel/addition work with Countertop, Cabinet, Flooring, Appliance, Painting, Security, Cleaning as common follow-on categories.
- Countertop
- Cabinet
- Flooring
- Appliance
- Painting
- Security
- Cleaning
RECORD ACTIVITY
Activity timeline
-
AUGUST 18, 2026
Residential Addition This permit
Permit · Remodel/addition · Inspection Phase