Wake, NC permit ELNR-036304-2026: DSINSP - Online…
This issued; description: wachter will be ins electrical permit covers Wake, NC permit ELNR-036304-2026: DSINSP - Online… in Raleigh, filed July 30, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 30 records on Buffaloe Road from Aug 20, 2025 through Aug 20, 2026, including 30 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JULY 30, 2026
Wake, NC permit ELNR-036304-2026: DSINSP - Online… This permit
Permit · Electrical · Issued; Description: Wachter will be installing up to 20 new