LIVE PERMIT
Wake, NC permit FIRE-024508-2026: FIRE - Fire…
This issued; description: spr-0114-2023 marac unclassified permit covers Wake, NC permit FIRE-024508-2026: FIRE - Fire… in Raleigh, filed July 28, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 11 records on Strickland Road from Aug 20, 2025 through Aug 20, 2026, including 11 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
Wake, NC County permits down 23% vs prior 30 days1530 permits vs 1987 · through Aug 24, 2026
RECORD ACTIVITY
Activity timeline
-
JUL 31, 2026
Wake, NC permit PLMNR-037377-2026: DSINSP - Plumbing (Non-Residential)
permit · Plumbing · Issued; Description: SPR-0114-2023 MARACAS MONTESSORI CLASSROOM - PH 1 THE SCOPE OF THE PROJECT CONSISTS OF A NEW 1,404 -
JUL 28, 2026
Wake, NC permit PLMNR-018535-2026: DSINSP - Plumbing (Non-Residential)
permit · Plumbing · Issued; Description: SPR-0114-2023 MARACAS MONTESSORI CLASSROOM - PH 1 THE SCOPE OF THE PROJECT CONSISTS OF A NEW 1,404 -
JUL 28, 2026
Wake, NC permit MECHNR-018730-2026: DSINSP - Mechanical (Non-Residential)
permit · HVAC · Issued; Description: SPR-0114-2023 MARACAS MONTESSORI CLASSROOM - PH 1 THE SCOPE OF THE PROJECT CONSISTS OF A NEW 1,404 -
JULY 28, 2026
Wake, NC permit FIRE-024508-2026: FIRE - Fire… This permit
Permit · Unclassified · Issued; Description: SPR-0114-2023 MARACAS MONTESSORI CLASSR -
JUL 28, 2026
Wake, NC permit ELENR-020201-2026: DSINSP - Electrical (Non-Residential)
permit · Electrical · Issued; Description: SPR-0114-2023 MARACAS MONTESSORI CLASSROOM - PH 1 THE SCOPE OF THE PROJECT CONSISTS OF A NEW 1,404 -
JUL 28, 2026
Wake, NC permit BLDNR-019716-2026: Building
permit · Unclassified · Issued; Description: SPR-0114-2023 MARACAS MONTESSORI CLASSROOM - PH 1 THE SCOPE OF THE PROJECT CONSISTS OF A NEW 1,404 · $285,055