Wake, NC permit MECHR-026424-2026: DSINSP -…
This issued; description: construction of new hvac permit covers Wake, NC permit MECHR-026424-2026: DSINSP -… in Raleigh, filed July 22, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 12 records on Marilyn Drive from Aug 20, 2025 through Aug 20, 2026, including 12 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect HVAC work with Insulation, Duct cleaning, Smart thermostat, Air quality, Solar as common follow-on categories.
- Insulation
- Duct cleaning
- Smart thermostat
- Air quality
- Solar
RECORD ACTIVITY
Activity timeline
-
JULY 22, 2026
Wake, NC permit MECHR-026424-2026: DSINSP -… This permit
Permit · HVAC · Issued; Description: construction of new single-family dwell -
JUL 22, 2026
Wake, NC permit PLMR-026426-2026: DSINSP - Plumbing (Residential)
permit · New construction · Issued; Description: construction of new single-family dwelling -
JUL 22, 2026
Wake, NC permit ELR-026422-2026: DSINSP - Electrical (Residential)
permit · New construction · Issued; Description: construction of new single-family dwelling -
JUL 22, 2026
Wake, NC permit ROW-034865-2026: DSENG - Right of Way
permit · New construction · Issued; Description: construction of new single-family dwelling -
JUL 22, 2026
Wake, NC permit BLDR-025012-2026: Building
permit · New construction · Issued; Description: construction of new single-family dwelling · $582,076