Wake, NC permit PLMNR-027916-2026: DSINSP -…
This issued; description: full demolition of demolition permit covers Wake, NC permit PLMNR-027916-2026: DSINSP -… in Raleigh, filed July 22, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 18 records on Wake Forest Road from Aug 20, 2025 through Aug 20, 2026, including 18 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Demolition work with New-construction GC, Hauling/dumpster as common follow-on categories.
- New-construction GC
- Hauling/dumpster
RECORD ACTIVITY
Activity timeline
-
JULY 22, 2026
Wake, NC permit PLMNR-027916-2026: DSINSP -… This permit
Permit · Demolition · Issued; Description: Full demolition of church building with -
JUL 22, 2026
Wake, NC permit MECHNR-027912-2026: DSINSP - Mechanical (Non-Residential)
permit · HVAC · Issued; Description: Full demolition of church building with basement, dumpster, asphalt, brick walkway, concrete, wood/ -
JUL 22, 2026
Wake, NC permit ELENR-027911-2026: DSINSP - Electrical (Non-Residential)
permit · Demolition · Issued; Description: Full demolition of church building with basement, dumpster, asphalt, brick walkway, concrete, wood/