Wake, NC permit ELR-035054-2026: DSINSP -…
This complete; description: to replace 125 am remodel/addition permit covers Wake, NC permit ELR-035054-2026: DSINSP -… in Raleigh, filed July 21, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
This is the only record collected on Bournemouth Drive in the latest 12-month window.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Remodel/addition work with Countertop, Cabinet, Flooring, Appliance, Painting, Security, Cleaning as common follow-on categories.
- Countertop
- Cabinet
- Flooring
- Appliance
- Painting
- Security
- Cleaning
RECORD ACTIVITY
Activity timeline
-
JULY 21, 2026
Wake, NC permit ELR-035054-2026: DSINSP -… This permit
Permit · Remodel/addition · Complete; Description: To replace 125 amp subpanel in garage