Wake, NC permit ELNR-035093-2026: DSINSP - Online…
This complete; description: install level 2 e ev charger permit covers Wake, NC permit ELNR-035093-2026: DSINSP - Online… in Raleigh, filed July 20, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 4 records on Pleasant Branch Drive from Aug 20, 2025 through Aug 20, 2026, including 4 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.
- Electrician (panel upgrade)
- Solar
RECORD ACTIVITY
Activity timeline
-
JUL 20, 2026
Wake, NC permit ELR-034988-2026: DSINSP - Online Only Electrical (Residential)
permit · EV charger · Issued; Description: install level 2 ev charger -
JULY 20, 2026
Wake, NC permit ELNR-035093-2026: DSINSP - Online… This permit
Permit · EV charger · Complete; Description: install level 2 ev charger for Tesla