Wake, NC permit ELR-028031-2026: DSINSP -…
This issued; description: townhomes, 5 units, electrical permit covers Wake, NC permit ELR-028031-2026: DSINSP -… in Raleigh, filed July 13, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 123 records on Spring Forest Road from Aug 20, 2025 through Aug 20, 2026, including 123 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
JUL 13, 2026
Wake, NC permit ROW-032886-2026: DSENG - Right of Way
permit · Unclassified · Issued; Description: Townhomes, 5 units, lots 12-16, 2 stories, VB Const, R3 Occupancy, SPR-0081-2023; BLDR-[contact red -
JUL 13, 2026
Wake, NC permit PLMR-028033-2026: DSINSP - Plumbing (Residential)
permit · Plumbing · Issued; Description: Townhomes, 5 units, lots 12-16, 2 stories, VB Const, R3 Occupancy, SPR-0081-2023; BLDR-[contact red -
JUL 13, 2026
Wake, NC permit MECHR-028032-2026: DSINSP - Mechanical (Residential)
permit · HVAC · Issued; Description: Townhomes, 5 units, lots 12-16, 2 stories, VB Const, R3 Occupancy, SPR-0081-2023; BLDR-[contact red -
JULY 13, 2026
Wake, NC permit ELR-028031-2026: DSINSP -… This permit
Permit · Electrical · Issued; Description: Townhomes, 5 units, lots 12-16, 2 stori -
JUL 13, 2026
Wake, NC permit BLDR-026631-2026: Building
permit · Unclassified · Issued; Description: Townhomes, 5 units, lots 12-16, 2 stories, VB Const, R3 Occupancy, SPR-0081-2023; BLDR-[contact red · $281,436