PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Wake, NC permit MECHNR-024587-2026: DSINSP -…

Raleigh · Wake, NC County

HVAC permit

This issued; description: new tenant build-ou hvac permit covers Wake, NC permit MECHNR-024587-2026: DSINSP -… in Raleigh, filed July 9, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 7 records on Park At North Hills Street from Aug 20, 2025 through Aug 20, 2026, including 7 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.

Wake, NC County permits down 23% vs prior 30 days1530 permits vs 1987 · through Aug 24, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect HVAC work with Insulation, Duct cleaning, Smart thermostat, Air quality, Solar as common follow-on categories.

  • Insulation
  • Duct cleaning
  • Smart thermostat
  • Air quality
  • Solar

RECORD ACTIVITY

Activity timeline

  1. JUL 17, 2026

    Wake, NC permit BLDNR-020419-2026: Building

    permit · Remodel/addition · Issued; Description: New tenant build-out including new tenant finishes, lighting, partitions, and ceiling within leased · $341,932
  2. JUL 9, 2026

    Wake, NC permit PLMNR-024371-2026: DSINSP - Plumbing (Non-Residential)

    permit · Plumbing · Issued; Description: New tenant build-out including new tenant finishes, lighting, partitions, and ceiling within leased
  3. JUL 9, 2026

    Wake, NC permit ELENR-030962-2026: DSINSP - Electrical (Non-Residential)

    permit · Electrical · Issued; Description: New tenant build-out including new tenant finishes, lighting, partitions, and ceiling within leased
  4. JULY 9, 2026

    Wake, NC permit MECHNR-024587-2026: DSINSP -… This permit

    Permit · HVAC · Issued; Description: New tenant build-out including new tena
  5. JUL 9, 2026

    Wake, NC permit FIRE-030927-2026: FIRE - Fire Protection

    permit · Commercial · Issued; Description: New tenant build-out including new tenant finishes, lighting, partitions, and ceiling within leased
  6. JUL 9, 2026

    Wake, NC permit FIRE-030926-2026: FIRE - Fire Protection

    permit · Commercial · Issued; Description: New tenant build-out including new tenant finishes, lighting, partitions, and ceiling within leased