LIVE PERMIT
Wake, NC permit ELR-031215-2026: DSINSP -…
This complete; description: tesla charger ins ev charger permit covers Wake, NC permit ELR-031215-2026: DSINSP -… in Raleigh, filed July 7, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
This is the only record collected on Deneb Court in the latest 12-month window.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
Wake, NC County permits down 23% vs prior 30 days1530 permits vs 1987 · through Aug 24, 2026
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.
- Electrician (panel upgrade)
- Solar
RECORD ACTIVITY
Activity timeline
-
JULY 7, 2026
Wake, NC permit ELR-031215-2026: DSINSP -… This permit
Permit · EV charger · Complete; Description: Tesla Charger install