LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Solar permit

This issued; description: the 100kw ac invert solar permit covers Boulder, CO permit… in Boulder, filed August 18, 2026, with an estimated value of $7,200.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 9 records on 63Rd Street from Aug 20, 2025 through Aug 20, 2026, including 9 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 21% vs prior 30 days750 permits vs 620 · through Aug 19, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.

  • Roofers (pre-install inspect)
  • Battery/backup
  • EV charger
  • Electricians

RECORD ACTIVITY

Activity timeline

  1. AUGUST 18, 2026

    Boulder, CO permit… This permit

    Permit · Solar · Issued; Description: The 100kW AC inverter on the existing s · $7,200
  2. JUL 23, 2026

    Boulder, CO permit 93591bbb-8302-4cda-8c69-1ecf996800b2: Electrical Permit

    permit · Solar · Issued; Description: 301 · $150,000
  3. MAY 13, 2026

    Boulder, CO permit 36f146e3-c442-404b-b3cf-e0b4078f8d9a: Right-of-Way Permit

    permit · Unclassified · Issued; Description: WO 115778142 - Traffic control to perform pole change outs and install fiberglass equipment for Xce · $1,200