PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

H - Residential New Construction Permit

Gainesville · Hall County

Remodel/addition permit

This pending; description: new 1 story sfr -3 remodel/addition permit covers H - Residential New Construction Permit in Gainesville, filed August 19, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 13 records on Holden Street from Aug 20, 2025 through Aug 20, 2026, including 13 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.

Hall County permits up 238% vs prior 30 days673 permits vs 199 · through Aug 19, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Remodel/addition work with Countertop, Cabinet, Flooring, Appliance, Painting, Security, Cleaning as common follow-on categories.

  • Countertop
  • Cabinet
  • Flooring
  • Appliance
  • Painting
  • Security
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. AUGUST 19, 2026

    H - Residential New Construction Permit This permit

    Permit · Remodel/addition · Pending; Description: NEW 1 STORY SFR -3 BEDROOM 2 BATHROOM