Boulder, CO permit…
This issued; description: this is to add a te electrical permit covers Boulder, CO permit… in Boulder, filed August 19, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 14 records on 22Nd Street from Aug 20, 2025 through Aug 20, 2026, including 14 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 20, 2025 through Aug 20, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
AUGUST 19, 2026
Boulder, CO permit… This permit
Permit · Electrical · Issued; Description: This is to add a temporary power pole p