PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Wake, NC permit BLDNR-006373-2026: Building

Raleigh · Wake, NC County

Solar permit

This complete; description: installation of 1 solar permit covers Wake, NC permit BLDNR-006373-2026: Building in Raleigh, filed February 24, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 2 records on N Raleigh Boulevard from Aug 11, 2025 through Aug 11, 2026, including 2 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.

Wake, NC County permits down 22% vs prior 30 days403 permits vs 518 · through Aug 9, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.

  • Roofers (pre-install inspect)
  • Battery/backup
  • EV charger
  • Electricians

RECORD ACTIVITY

Activity timeline

  1. FEBRUARY 24, 2026

    Wake, NC permit BLDNR-006373-2026: Building This permit

    Permit · Solar · Complete; Description: Installation of 194